British American Tobacco, Ibadan
- Client
- British American Tobacco Nigeria
- Location
- Ibadan, Oyo State
- Year
- 2003, maintenance from 2004

In 2003 the landscaping of the British American Tobacco site in Ibadan was carried out as a sub-contract to the main contractor, Laing International.
Landscape maintenance of the site followed. In a letter of attestation dated March 2005, BAT Nigeria confirmed that this maintenance had been carried out since January 2004.
The site photographs show wide lawns with young trees, ring hedges, palms, concrete walkways with kerbs, a thatched gazebo beside the swimming pool, and concrete drainage channels.
Delivered through Horty Benade, before Balanced Landscape Company was registered in 2013.





Project record
| Year | Client / organisation | Site / location | Scope | Delivered through |
|---|---|---|---|---|
| 2003 | British American Tobacco Nigeria | BAT factory, Ibadan (sub-contract to Laing International), Ibadan | Landscaping sub-contract | Horty Benade |
| From 2004 | British American Tobacco Nigeria | BAT, Ibadan, Ibadan | Landscape maintenance | Horty Benade |